Cressman Dining Facility


The Cressman Dining Facility was originally built in 1995 with an elevated slab supported by steel joists that had corroded over time.
Sealaska completely removed and rebuilt all the interior components of the structure and selected Mobile Enterprises, Inc. to install the Everlast Epoxy Flooring System in the (19) Kitchen and (11) Dining area rooms scheduled to receive epoxy flooring and integral cove base.
Project: Cressman Dining Facility
Owner: Goodfellow Air Force Base San Angelo, TX
System: Everlast Epoxy Systems
Area: 8,400 SF / 2,000 LF of 6” base
GC: Sealaska Constructors, LLC
Completed: February 2014