Northrup Grumman When Hurricane Rita roared through SW Louisiana and SE Texas, major damage was left in it’s wake. Chennault International Airport was hit with over $44–million in damages, which included Hanger “A”. It lost the roof, doors, sidewalls and all...
Parkland Hospital—Central Utility Plant As part of Parkland Health & Hospital System’s $1.2B new campus, the Central Utility Plant (CUP) comprises 81,146 square feet of cooling towers, a generator building, domestic water storage tank, chillers, boilers and a heat...
San Antonio Methodist Hospital Before MpS Construction—Design selected Mobile Enterprises, Inc., a certified applicator, to install an Everlast Epoxy system on the floor and wall surfaces of an existing Kitchen area at the Methodist Hospital in San Antonio, TX. Water...
The Advocate-Rieger Newspaper Production Center During The Advocate Newspaper of Baton Rouge has constructed a new publishing facility. Mobile Enterprises, Inc. was selected by The Lemoine Company, the General Contractor, to install all the resinous floors in the new...
Alcon Labs Project: QA Building Shop Floor Contractor: Hill & Wilkinson Owner: Alcon Labs System: Dur-A-Flex – Shop Floor Area: 1,000 SF Date: November 2005 Alcon Labs of Fort Worth was remodeling an existing building to incorporate a new plastic injection...