Plano Presbyterian Hospital

Before

Potter Structures pulled the forms from this  load-bearing column to find large voids with exposed post-tension cabling inside located at the top of the column.

Mobile Enterprises was contracted to pump MasterFlow 928, a flowable high-strength hydraulic grout to fill the void completely. Formwork was installed around the voids with custom-made injection fittings attached. The cementitious grout was hand-pumped into place until excess material escaped through the vent holes that were drilled above the voids. A test cube was broken after two days and exceeded 3,500 psi. The outside void was then hand-patched with Gel Patch.

 

Project: Plano Presbyterian Hospital

GC: Austin Commercial

Concrete Contractor: Potter Structures

Material: MasterFlow 928 Grout

Completed: December 2014

Before

During