Frank Kent Cadillac During The addition of a new body shop on the first level of this double tee parking garage required a waterproof deck coating above it on level two. The system does not incorporate a urethane or flexible epoxy top coat, rather the EnviroLastic® is...
Galleria Mall North Parking Garage Project: Galleria Mall North Parking Garage Houston, TX Specifier: Madeley Engineers System: Waterproof Deck Coating System Area: 200,000 Sq. Ft. Completed: 1990 This 200,000 sq. ft. plus post tension double tee parking garage has...
Granbury Wet Well Bill Scott, President of Scott Tucker Construction, contacted Mobile Enterprises, Inc. to pressure-inject leaking cracks at the bottom of their 40-foot deep concrete wet well with SealBoss 1510 expandable Waterstop Foam. Standing...
Mobil Oil Jeene Joint and HDPE Liner Project: Spillway at SIB Owner: Mobil Oil Corporation Beaumont, Texas System: Jeene Joint HDPE Liner Area: 108 LF Joint 1,080 Sq. Ft. Membrane Completed: March, 1999 Impounded storm water was seeping up through various joints in...
Neil P. Anderson Building Project: Neil P. Anderson Building at Burnett Park Fort Worth, TX Owner: Neil P. Anderson Cotton Exchange System: Tremco’s 215-mil Tremproof 150 Hot Rubber Membrane Area: 3,840 SF Completed: March, 2006 Completed in 1921, the Cotton Exchange...