Frank Kent Cadillac

Frank Kent Cadillac During The addition of a new body shop on the first level of this double tee parking garage required a waterproof deck coating above it on level two. The system does not incorporate a urethane or flexible epoxy top coat, rather the EnviroLastic® is...

Galleria Mall North Parking Garage

Galleria Mall North Parking Garage Project: Galleria Mall North Parking Garage Houston, TX Specifier: Madeley Engineers System: Waterproof Deck Coating System Area: 200,000 Sq. Ft. Completed: 1990 This 200,000 sq. ft. plus post tension double tee parking garage has...

Granbury Wet Well

  Granbury Wet Well     Bill Scott, President of Scott Tucker Construction, contacted Mobile Enterprises, Inc. to pressure-inject leaking cracks at the bottom of their 40-foot deep concrete wet well with SealBoss 1510 expandable Waterstop Foam. Standing...

Mobil Oil Jeen Joint & HPPE Liner

Mobil Oil Jeene Joint and HDPE Liner Project: Spillway at SIB Owner: Mobil Oil Corporation Beaumont, Texas System: Jeene Joint HDPE Liner Area: 108 LF Joint 1,080 Sq. Ft. Membrane Completed: March, 1999 Impounded storm water was seeping up through various joints in...

Neil P. Anderson Building

Neil P. Anderson Building Project: Neil P. Anderson Building at Burnett Park Fort Worth, TX Owner: Neil P. Anderson Cotton Exchange System: Tremco’s 215-mil Tremproof 150 Hot Rubber Membrane Area: 3,840 SF Completed: March, 2006 Completed in 1921, the Cotton Exchange...