DART GC-1 & GC-3 Bridge Decks

DART GC-1 & GC-3 Bridge Decks

DART GC-1 & GC-3 Bridge Decks Archer-Western Construction selected Mobile Enterprises, Inc. to waterproof the elevated bridge decks associated with DART’s GC-1 and GC-3 contracts from Fair Park in Dallas north to Carrollton, Texas. This totaled (4) steel-decked...
DART GC-1 & GC-3 Aerial Platform

DART GC-1 & GC-3 Aerial Platform

DART GC-1 & GC-3 Aerial Platform Before During Archer Western selected Mobile Enterprises, Inc. to install Tremco’s 201/60 fluid-applied membrane and protection board under the sand bed and pavers at four (4) aerial platform slabs along DART’s GC-1 and GC-3...
Frank Kent Cadillac

Frank Kent Cadillac

Frank Kent Cadillac During The addition of a new body shop on the first level of this double tee parking garage required a waterproof deck coating above it on level two. The system does not incorporate a urethane or flexible epoxy top coat, rather the EnviroLastic® is...
Galleria Mall North Parking Garage

Galleria Mall North Parking Garage

Galleria Mall North Parking Garage Project: Galleria Mall North Parking Garage Houston, TX Specifier: Madeley Engineers System: Waterproof Deck Coating System Area: 200,000 Sq. Ft. Completed: 1990 This 200,000 sq. ft. plus post tension double tee parking garage has...
Granbury Wet Well

Granbury Wet Well

  Granbury Wet Well     Bill Scott, President of Scott Tucker Construction, contacted Mobile Enterprises, Inc. to pressure-inject leaking cracks at the bottom of their 40-foot deep concrete wet well with SealBoss 1510 expandable Waterstop Foam. Standing...