Allen Center – Cooling Tower

Allen Center – Cooling Tower  Before When it became time to replace the failed lining in the main cooling tower for Allen Center in downtown Houston, Trizec Properties investigated several different materials and contractors. The main tower was built over 20...

Diamond Shamrock Wastewater Facility

Diamond Shamrock Wastewater Facility Project: Diamond Shamrock Wastewater Facility – McKee Plant Owner: Diamond Shamrock System: EnviroLastic® Area: 29,000 Sq. Ft. Completed: June, 1996 At their McKee Plant in Sunray, Texas, Diamond Shamrock built a new 29,000...

The Department of Energy

The Department of Energy When the DOE transfers nuclear waste by rail, a containment liner system is required in each of these Gondola Railcars.  The liner must be flexible with high impact, abrasion and tear resistance. The system must be uniformly applied with...

Drum Storage Area

Drum Storage Area The drum storage area at the Port Arthur Chemical Waste plant required an impervious containment liner in case of a spill. Chem Waste looked at several systems and decided on EnviroLastic® because of its ability to bridge present and future cracks,...

Encycle Tank Lining

Encycle Tank Lining The fiberglass lining in Tank #2 was debonding from the floor of the tank and coming up in large segments. Comparing the costs of either replacing the failed lining with fiberglass or EnviroLastic®, the owner chose EnviroLastic® because of the...